Product Features and Details
                                
                                
                                Prototype: In 1926, DRG ordered further electric locomotives as improvements on the E77 for operation in the southern and central German network. While the electrical systems remained virtually unchanged, a new one part vehicle frame was designed with the axle sequence 1´BB1´. Due to the running gear changes, the maximum permissible speed was set at 70 km/h, raising hopes of better utility in mixed passenger and goods train schedules. 79 locomotives were planned. E75 01-12 went to south Germany, while the E75 51-69 went to Leipzig West, Wahren, Bitterfeld and Magdeburg- Buckau. 
Model Details: 
- 3rd front light can be switched on or off with a switch, in digital mode with a function key 
- Extra mounted handrails in low-material thickness 
- Three-point support 
- Finely detailed chassis 
- Finest paintwork and printing 
- Functioning pantographs (mechanical) 
- Reproduction of machine room 
- LED lighting 
- Metal arrangement of rods 
- Metal wheels and frame 
- True-to-original: different front windows and lanterns 
- Prototypical multipart roof-fittings 
- High maintainability due to simple dismantling of the body 
- Re-lubrication of the engine bearings and screws is possible 
- Through holes in the PC board and gearbox cover or after dismantiling of the body